Borno Solar Phase 1

 

EM-ONE developed contract-ready solar system designs for select general hospitals, general hospitals, primary health centres and schools in the North East of Nigeria, an area suffering a major crisis due to years of Boko Haram insurgency. We provided turnkey EPC f 3 proprietary standard solar micro grids at three general hospitals across Borno State.

Borno Solar Phase 1 was a finalist at the Intersolar’s 2018 THE SMARTER E AWARD in the "Outstanding Projects” category. 


 
 
DJI_0001.JPG



Lagos Solar

 

EM-ONE provided design consultancy, project management, and test & commissioning services. The project comprised of 213 off-grid solar systems with integrated backup battery banks and remote monitoring systems installed at 11 Primary Health Centres and 175 secondary schools across 10 Local Government Areas.


 
 
DSC00497+%282%29.jpg



Kaduna Solar

 

EM-ONE undertook the site survey, front-end engineering & design consultancy of 40 off-grid PV systems at primary health centres across Kaduna State, as well as the project management for construction & installation of 34 of these systems.


 
 
FDV_0775%2BNo%2BWires.jpg



Mini-grid Design & Operation Plan

 

EM-ONE produced a mini-grid master plan through the site survey of 10 Wards across Nigeria that informed the front-end engineering of give standard solar system designs and six business models that could be scaled on a national level to address energy access challenges faced in rural and non-electrified parts of the country.


 
 
DJI_0033.jpg



Other Key Projects

 
  • Project Management & Engineering Support to Nigeria Infrastructure Advisory Facility (NIAF) for 22 numbers of TCN Transmission substations and lines.

  • Design & Engineering of grid interconnection (substation & transmission line) of 80MW Solar Farm in Nigeria.

  • Feasibility study for 4 X 20 MW Utility Solar Projects in Northern Nigeria

  • Design, Engineering and Construction of Solar Hybrid Systems for Total Service Stations in various locations in Nigeria.

  • The Rural Electrification of 200 communities across Nigeria for various state government, Federal Ministry of Power, and Rural Electrification Agency, Nigeria.


 
 
shutterstock_763594540.jpg